TKDA helped complete major interstate connection with key water resources and permitting services
The TH 610 Completion Design-Build project created a connection between the existing TH 610 and I-94. To help complete this project, TKDA provided roadway design, water resources and permitting services.
Water resource engineering included the design of multiple filtration basins, wet ponds, 35,000-feet of storm sewer, multiple centerline culverts, floodplain mitigation and SWPPP to account for staging over multiple phases of the project. Two bridges over Elm Creek and a bridge over Rush Creek required detailed HEC-RAS modeling, Risk Hydraulic Memorandums and Letter of Map Revisions to FEMA. TKDA coordinated with multiple agencies to obtain all permits needed for the project.