
The River Falls North Interceptor Sanitary Sewer project strengthened essential public infrastructure by eliminating an existing lift station and forcemain. TKDA performed preliminary studies, designed facilities, and provided construction observation while analyzing routes and construction methods to determine the best solution. The project also included extensive property acquisition, resolution of a property rights dispute tied to access and maintenance of an existing interceptor segment, and restoration of a stormwater management facility.