When the City of St. Louis Park needed to improve their sanitary lift station they selected TKDA to provide design and construction administration services for the rehabilitation project.
The TKDA project team worked in conjunction with the St. Louis Park public works staff to develop a staged construction rehabilitation that eliminated the need for bypass pumping during construction of the lift station improvements. TKDA’s design included new electrical service, a new generator, three new pumps, valves and related piping and a new ventilation system. The construction work plan allowed for the continuous operation of two pumps during all improvements and removal of old equipment.