
Metro Transit needed to replace 18 aging and failing vehicle lifts at its MJ Ruter, East Metro, South, and Overhaul Base garages. TKDA prepared construction documents for a range of lift systems selected to meet the needs of each facility, including two-post, parallel, scissor, and specialized wash-bay lifts.