Careers at TKDA

Northstar Commuter Rail: Fridley Pedestrian Tunnel

Creating a Safe Crossing Beneath Five Active Rail Tracks

A safe pedestrian crossing was needed at the proposed Fridley Station along the Northstar Commuter Rail corridor. BNSF Railway selected TKDA to prepare bidding documents and oversee construction of a pedestrian tunnel beneath five active railroad tracks. The completed tunnel is 160 feet long, 12 feet wide, and 10 feet high. It consists of five-foot-long reinforced, precast concrete segments that form the tunnel enclosure beneath the active corridor.

Location
Minnesota
Client
BNSF Railway Company
Market
Transportation
Market Segment
Rail
To limit disruption to rail operations, TKDA divided construction into two phases governed by tightly controlled work periods. BNSF provided a two-day work window for the first phase and a 30-hour work window for the second. The resulting tunnel established a dedicated crossing for passengers while accommodating the operational demands of the active tracks above.