TKDA performed multi-disciplinary engineering analysis of aging operating facility
With a 40-year-old operating plant, a North American taconite pellet producer needed to look for potential solutions to improve efficiency and production. TKDA performed an infrastructure analysis of the aging facility.
TKDA’s work included an evaluation of structural, electrical and mechanical systems of the building structures and the physical plant. The project scope also called for analysis of the process input delivery systems and the operating equipment and balance of plant systems. Drawing on extensive industrial facilities experience, TKDA was able to provide a thorough analysis of the current state of the facility and assist the Client to develop a long-range plan for the future.