All
  • Divisions
    • Overview
    • Architecture
    • Aviation
    • Facilities Engineering
    • Municipal
    • Rail
    • Surface Transportation
  • Our Work
    • Overview
    • Aviation
    • Bridge
    • Corporate
    • Education
    • Energy
    • Environmental
    • Agricultural Food & Beverage
    • Government Facilities
    • Highway
    • Manufacturing & Industrial
    • Mass Transit
    • Mining
    • Municipal
    • Rail
    • Sports & Recreation
    • Traffic
    • Trails & Parks
    • Water / Wastewater
  • Services
    • Overview
    • Architecture
    • Engineering
    • Planning
    • Specialty Services
  • Our Company
    • Overview
    • Our People
    • Our Story
    • Our Giving
    • Diversity, Equity & Inclusion
    • Sustainability
  • Careers
    • Overview
    • Be An Owner
    • Why TKDA
    • Students & Graduates
    • Professionals
    • Benefits
    • Have Fun
    • Current Openings
  • News
  • Contact Us
  • Purchase Plan Sets
TKDA
MENU
Back To Our Work
Our Work

Marie Avenue and Wesley Neighborhood Improvements

TKDA follows Minnesota Statutes to improve pavement and regional trails

The City of Mendota Heights retained TKDA to improve the pavement within the Wesley Lane Neighborhood and Marie Avenue between Lexington Avenue and Dodd Road. Both projects followed Minnesota Statutes 429 and involved assessments. State Aid funding was used on both projects and therefore needed to meet State Aid standards. Other coordination included private utility relocation and coordination with Dakota County for regional trail improvements.

The Wesley Neighborhood Improvements included rehabilitation of local roadways. The general improvements included full depth pavement reclamation and spot curb and gutter replacement. Several areas required soil correction. As a part of this project, a key area of trail on the adjacent Dodd Road was built.  This involved filling the roadside ditch, installing a storm sewer, adding curb and gutter along Dodd Road and building the trail. The grades on Dodd Road were carefully considered so as to minimize Dodd Road impact. 

In the following year, Marie Avenue was rehabilitated to provide land bridge repair, pavement and traffic improvements and trail rehabilitation.

Communication with residents was an important part of the project and included neighborhood meetings, public hearings, special in person meetings, newsletters and special flyers.

Client
City of Mendota Heights
Location
Mendota Heights, MN
Services Provided

Soil Correction
Trail Rehabilitation
Watermain Replacement
Traffic Improvements
Construction Services
Drainage Design
Public Involvement

Markets
Municipal
Street Improvements
Twitter LinkedIn
TKDA Offices
  • Saint Paul
  • Duluth
  • Chicago
  • San Bernardino
  • Seattle
  • Purchase Plan Sets
Twitter LinkedIn
Privacy Policy. TKDA © 2023. All Rights Reserved.