Northern Tier Energy (NTE) needed a consolidated administration facility that would provide optimal workspace. TKDA assisted in the process by assessing their current facilities and generating a program conceptual design for the new facility.
After the original study was completed a merger occurred which resulted in a new organizational structure and required TKDA to review and update the projected space needs. The study resulted in the design and construction of a 42,000 SF, two-story administrative office building designed for its refinery location in St. Paul Park. It included offices, multi-use and flexible training facilities, medical suite, conference rooms, lunchroom, locker rooms and other support service activities.