TKDA played a major role in the design of the I-35W St. Anthony Falls Bridge project, under contract with Figg Engineering Group. As part of the FMJV Design-Build Project Team, TKDA was the design engineer of record for the Interstate highway and local roadways, second street bridges, retaining walls, water resource engineering, pedestrian tunnel, signing, signals, utilities, lighting, and maintenance of traffic on this critical bridge replacement. The project, which received national attention, was completed and opened to traffic months ahead of the original aggressive schedule.
AWARDS: 2009 – Outstanding Civil Engineering Achievement Award Finalist, American Society of Civil Engineers; 2009 – Grand Award from ACEC of Minnesota; 2008 – #1 Bridge of the Year from Roads and Bridges Magazine