Proposed Improvements
Roadways
This project will reconstruct Radisson Road/County State Aid Highway
(CSAH) 52 from 125th Avenue NE to Bunker Lake Boulevard (CSAH
116) and Bunker Lake Boulevard from Highway 65 to Radisson Road.
The two roadways will be widened to four lanes (two through lanes
in each direction) with a raised median, shoulders, and turn lanes.
The roadways will have curb and gutter and storm sewer.
Traffic
Signals
The widening of Radisson Road will require reconstruction of the
traffic signal at 125th Avenue NE. New traffic signals will be
installed at the Radisson Road/Bunker Lake Boulevard intersection
and at the Radisson Road/Quail Creek Parkway NE/129th Avenue NE
intersection..
Ponds
Since the roadways will be constructed with curb and gutter and
storm sewer, water quality ponds will be needed.
Pedestrian/Bicycle
Trail
A trail will be constructed along the west side of Radisson Road
and the south side of Bunker Lake Boulevard in the project area.
Need
for Project
Both Radisson Road and Bunker Lake Boulevard are classified as
minor arterial roadways, so their primary function is to provide
mobility. The project will improve traffic operations by adding
through lanes. Safety will be improved by adding turn lanes, which
will move turning traffic out of the through lanes. Safety will
also be improved by the construction of the raised median, which
will reduce the number of full access intersections, thereby reducing
the number of vehicle conflicts.
The trail along both roadways
will improve mobility and increase safety for pedestrians and
bicyclists.